Technical Schedule
Wednesday, February 03, 2010
7:00am - 1:00pm CONFERENCE REGISTRATION
1:00pm Opening Remarks
1:15pm "Case Study: Fitness-for-Service Evaluation of Fired Heater Manifold" Frank Gareau Skystone Engineering
1:50pm "Case Study: Developing a Visual Inspection Program for Pressure Relief Systems" Rick Marsden EnCana
2:20pm coffee break
2:40pm "Fitness-for-Service of a High Pressure, High Temperature Vessel" John Aumuller EDA Ltd.
3:15pm "Case Studies: Defect Assessment Using FEA and Fracture Mechanics" Devon Brendecke Quest Integrity Group
3:50pm Town Hall Meeting Harold Hadley / Vanessa Rawlins IPEIA
Thursday, February 04, 2010 – STREAM ONE: MAX BELL AUDITORIUM
8:05am "Pressure Vessels - Design Registration Issues" Djordje Srnic ABSA the pressure equipment safety authority
8:50am "Cradle to Grave Management of Fixed Equipment with North American Codes and Standards" John Reynolds Pro-Inspect
9:35am "Stress Corrosion Cracking Failure of an Extractor Vessel and Brittle Fracture of a Hot Separator Vessel" Gerrit Buchheim The Equity Engineering Group, Inc.
10:15am coffee break
10:30am "High Temperature Hydrogen Attack Resistance Using Autoclave Testing of Scoop Samples" Tim Munsterman Lloyd's Register Capstone, Inc.
11:15pm "Materials for Oil and Gas Projects: Traditional and Modern" Allan McIntyre Hatch Ltd.
Noon working lunch
1:30pm "Overview of Typical Boiler Failures and Life Assessment Techniques" Cheryl Kostiuk Babcock & Wilcox Canada
2:15pm "Passive Fire Protection (PFP)" Graham Boaler Leigh's Oil and Gas Business Unit
3:00pm coffee break
3:15pm "Qualitative vs. Quantitative Methods Used in Pressure Relieving Devices in Refineries" Jesus Esquivel COMIMSA Mexico
4:00pm "The Use of the Electrogas Welding Process in the Construction of Storage Tanks and Pressure Vessels" Tom Landon Chicago Bridge & Iron Company
Thursday, February 04, 2010 – STREAM TWO: TCPL Building, Room 201
8:05am "Piping Failure - External Corrosion Problem" Art Jensen Sunoco
8:50am "Design, Operations, Inspection and FFS Considrations for Nozzles in Cyclic Loading Service" Boyd McKay The Equity Engieering Group, Inc.
9:35am "Flow-Induced Vibration Problems Common in Industry Pressure Equipment" Lyle Breaux Stress Engineering Services, Inc.
10:15am coffee break
10:30am "Welding Properties and Processes for Titanium and Titanium Alloys for Use in Corrosive Applications" Brett Krueger ATI Wah Chang
11:15am "Finite Element Analysis and Integrity Management" Jason Durand RAE Engineering & Inspection
Noon working lunch
1:30pm "Case History: Advanced NDE & FFS Assessment of HIC Damaged Contactor" Dr. Alex Tatarov Skystone Engineering
2:15pm "Implementation of AB-518, Pressure Piping Construction Requirements" Hennie Prinsloo RAE Engineering & Inspection
3:00pm coffee break
3:15pm "Oxygen Service System Hazards" Kim Dunleavy Dunleavy Technical Services Inc.
Friday, February 05, 2010
8:00am "VHP Manway Leakage Investigation and Solution" Dana Cole ATCO Power
8:45am "Root Cause Failure Analysis of Pyrolysis Furnace Crossover Piping Systems" Lorrie Davies NOVA Chemicals Corp.
9:30am "Case Study: An Owner's Adventure with Pump Quality Issues" Anthony Merle Canadian Natural Resources Ltd.
10:15am coffee break
10:30am "Asset Preservation and Mothballing Process Plants" Harold Babuik Methanex
11:15am "Closing Remarks" Harold Hadley IPEIA
|